Application of Precedent Type Analysis (PTA) in the Construction of Ertan Hydro-electric Station, China
자료유형 | 해외논문 |
---|---|
저널명 | Application of Precedent Type Analysis (PTA) in the Construction of Ertan Hydro-electric Station, China |
등록번호 | M0603506008 |
저자 | Shihui Li, Xiangyang Wu and Fengshan Ma |
연도 | 1998 |
권/호 | 035/06 |
페이지 | 787 ~ 795 |
키워드 | Application, Precedent Type Analysis (PTA), Construction, Ertan Hydro-electric Station, China, rock stability, tunnelling projects |
원문링크 | 원문링크 |
유형별 논문
Shihui Li, Xiangyang Wu and Fengshan Ma. (1998). Application of Precedent Type Analysis (PTA) in the Construction of Ertan Hydro-electric Station, China.
댓글